The Process


Familiarize yourself with our three phases as well as optional work to complete the proposed addition and renovation of your existing house. This will help you to have maximum control over the total project cost.

Phase 1 - Proposed building with finished exterior:

1. Preliminary design drawings  
2. Committee of adjustment application (if needed)  
3. Permit drawings and application  
4. Demolition and disposal of existing roof  
5. Excavation and foundation (for back/side additions and new homes)  
6. Superstructure installation  
7. Roofing ,aluminum work and caulking  
8. Exterior detailing and clean up 

Phase 2 - Finishing of the interior of new addition:

1. Heating, ventilation and air-conditioning  
2. Plumbing rough-in and fixtures installation  
3. Electrical wiring and finishing  
4. Insulating, drywall and taping  
5. Interior millwork (doors, trimming, shelving)  
6. Flooring (carpet, hardwood, ceramics etc.)

7. Cabinetry (Bathrooms, Built in units)  
8. Painting and decorating

Phase 3 - Existing building renovation:

1. Demolition work and disposal  
2. Exterior walls refinishing  
3. New or existing windows/door installation/replacement  
4. Interior framing, drywall, taping  
5. Mechanical works (heating, plumbing, electrical)  
6. Interior millwork (doors, trimming, shelving)

7. Cabinetry (Kitchens)  
8. Flooring (carpet, hardwood, ceramics, etc.)  
9. Painting and decorating  

Get a Detailed Quote or give us a
call at (416)759-4663

Additions
Exterior Renovations
Interior Renovations

Contact Information:


First Name:
Last Name:
Email:
Phone:

Project Details:

Preferred Contact Method:

Submit